Time and items required, Removing a blade, Time and items required removing a blade – Brocade DCX 8510-4 Backbone Hardware Reference Manual User Manual
Page 65

This section is applicable for all the following port, application, and encryption blades supported on the
DCX 8510 chassis:
Blade
DCX
DCX-4S
DCX 8510-4
DCX 8510-8
FC8-32E port blade
No
No
Supported
Supported
FC8-48E port blade
No
No
Supported
Supported
FC8-64 port blade
Supported
Supported
Supported
Supported
FC16-32 port blade
No
No
Supported
Supported
FC16-48 port blade
No
No
Supported
Supported
FC16-64 port blade
No
No
Supported
Supported
FCOE10-24 application
blade
Supported
Supported
No
Supported (only on
slot 1)
NOTE
Cannot be in the same chassis with FC8-48E, FC8-64, FC16-48, FC16-64, FS8-18, or
FX8-24.
FS8-18 encryption blade
Supported
Supported
Supported
Supported
FX8-24 application blade
Supported
Supported
Supported
Supported
Time and items required
The replacement procedure for each blade takes less than 10 minutes. Removing and restoring
transceivers and cables may take longer depending on how many must be changed. The following
items are required for the blade and filler panel replacement:
• Electrostatic discharge (ESD) grounding strap
• Workstation computer
• Replacement blade or filler panel
• #2 Phillips screwdriver
• Small form-factor pluggable (SFP+, mSFP, or QSFP) transceivers (as needed)
• Optical and copper cables (as needed)
NOTE
For information about the transceivers that are qualified for the Brocade chassis, refer to
Removing a blade
Complete the following steps to remove a blade.
Time and items required
Brocade DCX 8510-4 Backbone Hardware Reference Manual
65
53-1002177-07