Brocade TurboIron 24X Series Hardware Installation Guide

19

53-1002981-01

Verifying proper operation

2

FIGURE 7

Attaching the AC power cord

Repeat this procedure for the second power supply.

Verify the device is working properly (refer to

“Verifying proper operation”

.)

Powering off the system

To turn an AC system OFF:

Unplug the power cords from the power source.

Verifying proper operation

After you have installed any additional power supplies and powered on the system, verify that the
device is working properly.

1. Verify that the LEDs on the power supply and system power LED are solid green.

2. Verify proper operation by observing the LEDs on the front panel.

10G port LEDs should be lit while the device performs diagnostics. After the diagnostics are
complete, the LEDs will be dark except for those that are attached by cables to other devices.

If the links on these cables are good and the connected device is powered on, the link LEDs will
light.

Table 4

provides more details on specific LED conditions after system start-up.

Observing the power status LEDs

Table 4

lists the device LEDs that show power status.