Preparing the installation site, Cabling infrastructure, Installation location – Brocade TurboIron 24X Series Hardware Installation Guide User Manual
Page 24
![background image](/manuals/361649/24/background.png)
14
Brocade TurboIron 24X Series Hardware Installation Guide
53-1002981-01
Preparing the installation site
2
DANGER
Make sure that the power source circuits are properly grounded, then use the power cord
supplied with the device to connect it to the power source.
DANGER
If the installation requires a different power cord than the one supplied with the device, make
sure you use a power cord displaying the mark of the safety agency that defines the regulations
for power cords in your country. The mark is your assurance that the power cord can be used
safely with the device.
DANGER
For safety reasons, the ESD wrist strap should contain a series 1 MB ohm resistor.
Preparing the installation site
Cabling infrastructure
Ensure that the proper cabling is installed in the site. Refer to
or visi
for a summary of supported cabling types and their specifications.
Installation location
Before installing the device, plan its location and orientation relative to other devices and
equipment. Allow at least 3 in. of space at the front of the device for the twisted-pair, fiber-optic,
and power cabling. Also, allow a minimum of 3 in. of space between the sides and the back of the
device and walls or other obstructions.