This chapter contains the following sections:
•
•
•
•
•
•
•
•
Unpacking a system
DANGER
The procedures in this manual are intended for qualified service personnel.
Information about configuring IP addresses and connecting network devices is in the
“Connecting Network Devices and Checking Connectivity”
Brocade TurboIron systems ship with all of the items listed below. Please review the list and verify
the contents. If any items are missing, please contact the place of purchase.
Package contents
Verify the package contents listed below:
•
Brocade TurboIron 24X device with dual AC power supplies installed
•
AC power cord
•
Rack mount brackets and mounting screws (already secured on the device)
General requirements
To manage the system, you will need the following items for serial connection to a Layer 2 or Layer
3 switch:
•
A management station, such as a PC running a terminal emulation application.