8 signature measurement, Signature measurement -24 – Yokogawa YVP20S User Manual
Page 150
14-24
<14. DIAGNOSTIC SERVICES>
IM 21B04C50-01E
14.3.8 Signature Measurement
During the signature procedure, the current measuring signature, measurement setting,
real time data, real time curves, status and progress are displayed.
Figure 14.20 Signature Measurement
Window Title: the current execution signature.
Measurement Setting: the measurement condition of the signature in progress or other
message before signature starts.
Temp.: Temperature, the value of TB parameter ELECT_TEMP
Position: Value of the feedback signal of YVP110, FINAL_POSITION_VALUE.VALUE
Pressure: Value of output pressure of YVP110, MEAS_PRE_AIR
AO output: Value of input signal of YVP110. AO block OUT.VALUE
Actual Position (red): The curve of feedback signal of YVP 110,
FINAL_POSITION_VALUE.VALUE
Air Pressure (yellow): The curve of output pressure of YVP110, MEAS_PRE_AIR
AO output (blue): The curve of input signal of YVP110. AO block OUT.VALUE
Progress Bar: the current progress of the signature measurement.
Current Status: indicates current operation, or the measurement result.
Cancel Current Signature: Clicking this button will cancel the current executing signature,
and measure the next signature. For Measure All, it will terminate all the signatures.
Cancel All Signature: Clicking this button will cancel all the selected signatures.
Zoom In/Zoom out: In the curve displaying area, user can select a rectangle area to zoom,
and double click mouse to restore.