beautypg.com

Battery connection diagram – Controlled Products Systems Group HRG 220-A ST User Manual

Page 79

background image

Installation and Maintenance Manual

65

Battery Connection Diagram





























































Connect six wires to the gate operator as shown.

Install batteries as show, observing polarity:

Four 14 gauge wires to the control circuit.

Always connect red wires to (+) and black wires to (-). The exception is

Connect from lug terminals to DC motor:

the jumper wire which connects the two batteries.

Two 6 gauge minimum for 1hp operators

Two 2 gauge minimum for 2hp operators

This manual is related to the following products: