Pre startup check list (ugw-water-cooled) – ClimaCool UGW Manual User Manual
Page 24

www.climacoolcorp.com
22
Project Name: _________________________________________________Date:_________________________
Address: ___________________________________________________________________________________
YES NO
1. Are modules connected properly per Codes and Installation Manual?
___
___
(Installation, Operation & Maintenance Manual is available at www.climacoolcorp.com)
2. Does the module(s) nameplate voltage agree with the site voltage being supplied?
___
___
3. Is there a minimum of 60 mesh strainer on condenser and evaporator inlet water?
___
___
(Fill water to chiller being sure to pass through a minimum of 60 mesh strainer.)
4. Is condenser water system filled and flushed? (See “Filling the Water System” in ClimaCool IO&M.)
___
___
5. Is chilled water system filled, flushed and all air purged from system?
___
___
(Air must be purged from system prior to startup. See “Filling the Water System” in ClimaCool IO&M.)
6. Are all pumps tested and operational?
___
___
7. Is required GPM (verified by pressure differential) supplied to the chilled water side?
___
___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
8. Is required GPM/Pressure differential being supplied to the condenser?
___
___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
9. Pressure differential flow sensors set to trip on the drop below required flows?
___
___
(Set to trip on low flow (below 25% loss of flow), not pump on/off.)
10. Have all chiller coupling connections been leak tested?
___
___
11. Is water presently circulating through chiller?
___
___
12. Verified that temperature sensors and voltage/phase monitor have been installed?
___
___
13. Is power and communication wiring complete to each module?
___
___
14. Verify that wiring and devices meet with approved electrical submittal drawings?
___
___
15. Is required load available to run multiple compressors at startup?
___
___
16. Is control functional to maintain condenser water temperature?
___
___
(Includes maintaining “minimum” inlet temperature; see “Operational Limitations” in ClimaCool IO&M.)
17. Is a water header bypass installed at the chiller? Check one: ____ ClimaCool provided? ____Field provided?
If you checked “No” to any question above, provide the line reference number and the date of scheduled completion below.
Please note all conditions must be complete prior to the startup date.
__________________________________________________
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
*This form must be completed and submitted to ClimaCool a minimum of three (3) weeks prior to final scheduling of any startup.
……….
NOTE: If any of the above items are not complete at time of startup, back charges will be assessed for additional costs.
.........
....
Contractor Name: _________________________________________
Address:
_________________________________________
____________________________________________
_________________________________________
(Authorized Signature)
Phone:
_________________________________________
Date: _____________________________________________
Pre Startup Check List (UGW-Water-Cooled)