4.4.3 Mounting the enclosure

Concrete slab

Use the tagline to guide the enclosure as it is lifted. As the enclosure is lowered, align the mounting bolts and
drop the enclosure into place.

CAUTION: Follow all local safety practices and guidelines while lifting the enclosure. As the enclosure is
lowered, ensure that it remains as level as possible and lines up with the anchoring bolt locations. Ensure
the rubber mat is in the proper position. If the rubber ma

t is “ribbed”, the ribs should be against the

concrete. Open the door and proceed with leveling the enclosure and securing it into place.

Steel platform

If the steel platform is located at ground level, the procedures are the same as those for the concrete slab.

Roof mounting

CAUTION: The mounting platform must be installed before the enclosure can be installed. All grounding must be
in place before the installation.

Place the enclosure onto the roof using either a freight elevator with access to the roof, or a crane or hoist on the
roof.

Do not remove the enclosure from its pallet until it is on the roof and is ready to be placed.

4.4.4 Installing multiple enclosures side-by-side

If two or more enclosures are to be installed adjacent to one another, install the environmental components of the
interface kit before bolting the enclosures into place.