Enclosure installation, Enclosure preparation, Lifting preparation – Alpha Technologies Te43 User Manual
Page 23

Alpha Technologies Ltd.
057-104-C0 Rev B WC
Burnaby, British Columbia. Telephone: 604 436 5900 Fax: 604 436 1233.
Page 18 of 27
4.4
Enclosure installation
4.4.1 Enclosure preparation
Remove the protective covering from the system. The doors are designed to be locked with a pad-lock and are
secured with tie-wraps for shipping. Cut the tie-wraps and open the doors. The inside of the enclosure contains
the installation hardware.
Inspect the packing slip to verify that you have received all the equipment that you ordered.
All documentation is packed inside the equipment compartment.
Inspect all moving parts, hardware, connectors, and other equipment.
Report any damage to the shipper and Alpha Technologies.
Remove and properly dispose of all packaging.
Remove the rear panels to access the rear mounting bolts.
Remove the four bolts that secure the enclosure to the pallet. These bolts are accessible from the inside of
the enclosure and are located in the corners of the enclosure. The enclosure is now ready for lifting.
4.4.2 Lifting preparation
WARNING: Follow all local safety practices and guidelines while lifting the enclosure. All personnel
involved with lifting and placing the enclosure must wear head, eye protection, gloves when required.
Only properly trained and certified personnel should operate the crane. Only properly trained and
certified personnel should operate the forklift.
Make sure that the lifting eyes are securely fastened before lifting. Ensure that the clevises are correctly installed
and that the enclosure is approximately level when it is lifted. This will simplify the enclosure placement.
Close and latch the enclosure front door. The rear panels do not need to be installed.
Place the enclosed rubber mat onto the slab or platform. Orient the mat so that the mounting holes line up.
Figure 13
– Secure hooks in eyebolts