3.6 UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Procedure for the unpacking of the
UPS:
1
A
LPS33U_0
80-100_Un
packing_0
1
CENTER
OF
GRAVITY
UL
g
imaginatio
n at work
• Make sure to have sufficient
space around the UPS before
you start unpacking.
• Cut the straps “A” fixing the
carton box.
2
B
LPS33U_0
80-100_Un
packing_0
2
g
imaginatio
n at work
CENTER
OF
GRAVITY
UL
C
• Remove package “B”.
• Remove the protection “C” and
the accessories bag.
• Remove the screws “D” on the
four small bracket.
• Use a forklift to raise the UPS
from the floor.
• Remove the two wooden plates
“E”.
3
B
LPS33U_0
80-100_Un
packing_0
3
g
imaginatio
n at work
CENTER
OF
GRAVITY
UL
C
E
D
Fig. 3.6-1 LP33 Series 80 & 100 unpacking sequence
NOTE !
Be aware of the
heavy weight of the
UPS, in particular if
already equipped
with Batteries.
Included in the delivery you can find the following parts:
•
Control Bus cables (only for RPA parallel system)
•
CD-ROM connectivity
•