Installation, Prepare for installation, Safety – GE Industrial Solutions CPS2400U User Manual
Page 9: Installation tools, Equipment identification, Plan installation
CPS2400U Upstream System – 19” Product Manual
CPS2400U
850028186 r04 December 2013
9
Installation
Prepare for Installation
Safety
Read and follow all safety statements, warnings, and precautions in the Safety section and Specifications section of
this manual and manuals of all other equipment before installing, maintaining or repairing the equipment.
WARNING: Shock Hazard
Load outputs are current limited +/-190V.
WARNING: Shock Hazard
Outputs re-energize within 4 seconds when ground faults or short circuits are cleared.
Installation Tools
•Complete Standard Insulated tool set
•Wire cutters and strippers
•Digital meter, +/- 0.02%
•Heat shrink gun
•Screw Drivers (flat-blade and Phillips)
•Torque wrench (0-240 in-lb / 28 Nm)
•ESD wrist strap
•Socket set
Equipment Identification
Identify the product you have received. Make sure to select procedural steps to match the equipment being installed.
Plan Installation
The system has been designed for mounting in relay racks or in equipment cabinets. It is designed for use with user
provided vertical airflow.
• Follow site specific engineering instructions to assure proper airflow for the specific installation.
• Refer to the Vertical Spacing, Airflow, Baffles, and Fan Shelves section for general spacing requirements.
Follow site engineering instructions.
Converter system shelves are installed arranged as one or more Converter Shelf Stacks.
Baffles
• Baffle Required at top of each Converter Shelf Stack in customer premise locations for UL compliance.
Baffles not Required in outside plant cabinets, CEVs, or huts.
• Baffles must be oriented to direct air in from the front (aisle) and out to the back of the rack.
Vertical Space Rules:
• Vertical space is permitted below Baffles for future Converter Shelf addition.
Baffle may be installed 12.5 inch rack space above a Fan Shelf.
• No vertical space between:
• Fan Shelves
• Fan Shelf and Converter Shelf
• Converter Shelves
Airflow and Fan Shelves
• Upward Airflow – provided by Fan Shelves.
• Fan Shelves provide adequate airflow for specified operating temperatures.
Airflow per specification may be provided by other devices.
• A Fan Shelf is required for each Converter Shelf Stack.