Grain Systems PNEG-366 User Manual
Page 31
31
18' Autoflow
Grain Systems, Inc. Assumption, Ill.
REV. 11-20-96
Attach all 18 dump chute chains directly to the lift plate as shown in figure below.
Install all chains using "S" hooks (S-4692) to attach the chains to the dump chutes and lift plates. Keep excess
chain at the lift plate. Adjust the chains until the chutes are approximately level when the lift plate is in the closed
(up) position. Once the chains are uniformly adjusted, crimp the "S" hooks closed. Check when attaching the "s"
hook to the end link on a chain that the end has not been cut open. If this is found remove the end link or shift up
and use the next link in chain.
DUMP CHUTE CHAIN ASSEMBLY
Chain leading to outer chutes
(82") Adjust length as required
TD-100205
Center Lift Plate
(TD-100801)
Chutes in closed position
Crimp "S" hooks after
final chute adjustment
Cable Clamp
S-4693
Loop in Cable
Center Collar
Cross Brace
Lift Plate
To sidewall pulley
assembly
12" when chutes are level(closed)
Figure #37