Figure #34 leveling band location, Roof assembly, Figure #33 – Grain Systems PNEG-366 User Manual
Page 29
29
18' Autoflow
Grain Systems, Inc. Assumption, Ill.
REV. 11-20-96
Figure #34
LEVELING BAND LOCATION
Position leveling bands as shown in the drawings below.
Use (2) 5/16" x 3/4" bin bolts to attach bands to posts. Also use 5/16" x 3/4" bin bolts to join band sections. Note that
band sections connect to each other only at endmost holes until completing the circle where an overlap may occur.
ROOF ASSEMBLY
SPECIAL INSTRUCTIONS
It is now time to assemble the roof. When starting, align manway and ladder such that it coordinates with the other
accessories and does not interfere. The roof is assembled according to the instructions in the roof hardware box,
WITH THE FOLLOWING EXCEPTIONS:
1. Locate eave clips so that a roof sheet will be centered over sidewall ladder.
2. Four eave clip shims per eave clip must be installed.
3. Use TD-100274 Roof Brackets shipped in the Top Dry hardware rather than the brackets shipped in the roof
hardware.
Top Ring Sidewall Sheet
R-007-2
Small Eave Clip
TD-100045 (4)
Eave Clip Shim
TD-100274
Roof Bracket
Eave Clip Assembly
Figure #33
TD-100660
7.2"
TD-100662
15.2"
TD-100661
10"
.3/16"
6.13/16"
Outer Leveling Bands
6 Band Sections per Ring
27 Holes Between Posts
OK???
TD-100660
7.2"
TD-100661
10"
TD-100661
10"
6.3/8"
4.3/8"
2.3/16"
Inner Leveling Bands
3 Band Sections per Ring
13 Holes Between Posts
4.3/8"