Before bolting the sidewall sheets together, check that you have the
proper gauge steel for the first ring. The higher gauge numbers denote
the thinner materials. (For example: 20 gauge material is thinner than
14 gauge.) In erecting Top Dry grain bins the thinnest material always
goes on top. The first sidewall ring you assemble will be the second ring
from the top of your bin. Check the various gauges of your bin with the
Color Code Chart and begin building accordingly.
Once you have selected the proper gauge material, begin assembling the
sidewall sheets according to the instructions on the following page.
- For bolting specifications on stiffeners, see Figure #11.
Note: The rope caulking is installed before each sheet is assembled.
Apply rope caulking between the last vertical row of bolts and edge of
outside sheet. There is sufficient caulking for all vertical seams on
storage and drying bins. Wipe sheet clean where caulking is to be
applied.
9.3/8" (23.813 cm)
Standard
Caulking
9.3/8" (23.813 cm)
Standard Sidewall Sheets
As Viewed From Outside
GAUGE
COLOR CODE
22
White
20
Red
19
Black/Yellow
18
Orange
17
Pink/Light Blue
16
Blue
15
Brown/Red
14
Green
13
Yellow/Blue
12
Black
11
Pink
10
Light Blue
9
Blue/Orange
8
Yellow