beautypg.com

Reception and storage, Preparation and installation, Figure 1 – M&C TechGroup V..-H1 Series Operator's manual User Manual

Page 9: Heated t-connector

background image

9

Gas sampling and gas conditioning technology

6-6.1-ME

9

RECEPTION AND STORAGE

Please take the heated connector and possible special accessories carefully out of the packaging

material immediately after arrival, and compare the goods with the items listed on the delivery note!

Check the goods for any damage caused during delivery and, if necessary, notify your transport

insurance company without delay of any damage discovered

The heated connector usually is delivered in one packaging unit.

N O T E !

The equipment should be stored in a protected, frost-free room!



10

PREPARATION AND INSTALLATION

Locate the heated connector in such a way that there is adequate space for removing the cover.
Make certain that the heated connector is easily accessible so that you can carry out any subsequent
repair work without trouble.
The aluminium plate is fixed with 4 screws.

Figure 1

Heated T-connector