beautypg.com

Switch off, Maintenance – M&C TechGroup BA-P4 Operator's manual User Manual

Page 17

background image

17

Gas sampling and conditioning technology

10-1.1-ME

14

SWITCH OFF

N O T E !

The place of installation of the combustion air conditioning unit
must be remain free from frost also during time when the unit is
switched off !


No particular measures are required for switch off.


15

MAINTENANCE

Before carrying out maintenance work, the system and process-specific safety measures must be
observed!

W A R N I N G !



High voltage. Disconnect the mains plug before opening the
converter housing!


The following components of the BA... combustion air conditioning unit must be maintained:

Swing piston compressor for BA-P4 version after approximately 2000 operating hours (instructions,

see annex).

Filter element of the ambient air suction filter for BA-P4 version every six months.

Filter element of the high-efficiency particle filter after two years or with inadmissible pressure drop.


Our recommendations for spare parts are shown in the spare parts list in Chapter 18.

Replacement of the catalyst cartride (15.4) is necessary, when:

A leak is obvious, caused by defective O-rings of the catalyst cartridge (see 15.7);

The quality of catalysis decreases due to poisining.


The lifetime of the adsorber cartridge depends on the quality of the series connected catalysis.
Replacement of the cartridge (15.5) is necessary, when the quality of the combustion air conditioning
drops or a leak is obvious, caused by defective O-rings of the adsorber cartridge (15.7).

For catalyst or adsorber cartridge replacement, it is recommended also to replace the supplied O-ring
seals.