beautypg.com

M&C TechGroup SS-5_3 Operator's manual User Manual

Page 16

background image

16

Gas sampling and gas conditioning technology

4-3.1-ME


All parts which require maintenance work are housed in the gas conditioning system in such a way so
that they are easily accessible. These are (see figure 2):

The filter element of the preliminary filter FP-2T.

N O T E !

In order to protect the analysers which have been additionally connected,
it is recommended that in the event of a condensation irruption the moist
filter elements be replaced.

The preliminary filter for the peristaltic pump PF2. If the condensate contains particle residue, the

preliminary filter should be replaced at regular interv

als. The ‘one-way’ filter is situated in the

suction side of the pump hose (see figure 2) and can be easily replaced;

Hoses of the Condensate pump SR25.1. These should be checked every six months and, if

necessary, replaced;

Diaphragm of the sample gas pump N3KPE or N9KPE. These should be checked every six

months and, if necessary, replaced;