beautypg.com

Removing the pump head type n 3/5/9 kpe/kp18, Figure 6, Sectional drawing n3/5 kpe – M&C TechGroup N9 KP18 Operator's manual User Manual

Page 15: Figure 7, Sectional drawing n9 pe

background image

15

Gas sampling and conditioning technology

6-1.2.1ME


Figure 6 Sectional drawing N3/5 KPE

Figure 7 Sectional drawing N9 PE


Parts and tools required:

Valve plates, sealing rings (2 for each pump head) and structured diaphragm(s)

Screwdriver no. 1

N O T E !


Always change valve plates, diaphragm and sealing rings at the same
time.

Change the diaphragm, valve plates and sealing rings in the following sequence:

Remove pump head

Change diaphragm

Change valve plates and sealing rings

Refit pump head


Proceed as follows:

14.1

REMOVING THE PUMP HEAD TYPE N 3/5/9 KPE/KP18

Make a mark on the head plate 3 (N3/5 with metal frame), intermediate plate 2 and housing 1

with a felt-tip pen. This helps avoid incorrect assembly later

Undo the screws 4 in the head plate with the intermediate plate off the pump housing.


3

4

2

9

1

13

16

14

11

7

8