Page 12: Power

background image

12

Gas sampling and gas conditioning technology

2-0.1.1-ME

Carry out the following steps

:


230V 50Hz

(115V 60Hz)

Power

1

2

3

4

L

N

L

315W(300W)

Sensor

Tset

Figure 2

Electrical connection SP10-H

Remove the lid of the junction box;

Insert the mains cable (min. 3 x 1.5 mm2) through the cable gland and connect it to the appropri-
ate terminals as in the wiring above;

Screw lid back on;


15

START UP

Before starting up check whether the mains power supply voltage corresponds with the information
stated on the probe’s nameplate.

Switch on mains power supply.

The total heating-up time is approximately 1 hour. The sample gas can now be extracted via the gas
sample probe after this heating-up time.