ZyXEL Communications NSA210 User Manual
Page 309

Chapter 15 Maintenance Screens
NSA210 User’s Guide
309
Type
Select whether this power control schedule has the NSA turn on, turn
off, or reboot.
Frequency
Select whether the NSA is to apply this power control schedule entry on
a monthly, weekly, or daily basis.
Execute Time
(hh:mm)
Enter the time, day, and/or day of the month as appropriate for this
power control schedule entry. Leave more than 10 minutes between the
execution times of the entries.
If the NSA turns off or restarts while a user is transferring files to or
from the NSA, the transfer fails. The user will need to restart the
transfer.
The NSA skips a scheduled restart or power off if the execution time
comes while the NSA is doing any of the following:
• Resynchronizing a RAID
• Upgrading firmware
• Replacing the configuration file
If the NSA is turned off at the time when a restart or power off is
scheduled, the NSA does not perform the restart or power off.
If the NSA is turned on at the time when a power on is scheduled, the
NSA does not perform the power on.
Use this part of the screen to configure power on, power off, and reboot times.
Please select
the day of the
month
This is only available if you selected Monthly as your backup frequency.
Choose the day of each month when NSA performs the backup job.
Every how
many weeks?
This is only available if you selected Weekly as your backup frequency.
Enter the interval between weeks and choose on which day in the week
the NSA performs the backup job.
Every how
many days?
This is only available if you selected Daily as your backup frequency.
Enter the interval between days when the NSA performs the backup job.
Add
Click this to add the power control schedule to the list.
Apply
Click this to save your changes.
Cancel
Click this to return to the previous screen without saving.
Table 96 Maintenance > Power Management > Edit (continued)
LABEL
DESCRIPTION