beautypg.com

Riveline, Ttachment, Operation – Servis-Rhino RHINO AGM72 User Manual

Page 131: Oper a t io n, Driveline attachment

background image

OPERATION

Driveline Attachment

Adjusting Shaft Length

1. Slide the two halves of the shaft apart and

connect the halves to the tractor PTO shaft and the

mower input shaft.

2. Lay the shaft sections side-by-side. Mark the

shield on the tractor end where it meets the shield

cone on the mower end. Measure 3/8” back toward

the tractor and make a second mark.

O

PER

A

T

IO

N

3. Cut off the shield at the second mark. Now cut off

the same amount of the shaft as removed from the

shield and deburr the end of the shaft.

4. Cut the shield and shaft of the mower half so the

same amount is removed as the tractor half. Deburr

the ends, lubricate the shaft halves with grease and

reassemble the halves.

5. Install the IID shaft on the tractor and mower.

Raise and lower the mower to check for shaft

contact (bottoming-out) with the mower yoke end.

At the maximum compressed point, the shaft should

look like image.

Make sure that at least 4” on the

inner shaft remains engaged in the outer shaft at all

times.

AGM 52-62-72-82

10/10

Operation Section 4-21

© 2010 Alamo Group Inc.

This manual is related to the following products: