Assembly, Assem b l y – Servis-Rhino RHINO AGM72 User Manual
Page 107

ASSEMBLY
STEP 31. Mount the front bar and secure it to the upper rod with 2 hexagon head screws M10x90, 2 self-locking nuts M10
and 1 oval head set screw M12x60 with 1 self-locking nut M10 previously inserted screws and nuts.
STEP 32. Fasten the curtain to the bars with the belts. Belts must be fastened to the internal part of the curtain.
A
SSEM
B
L
Y
AGM 52-62-72-82
10/10
Assembly Section 3-17
© 2010 Alamo Group Inc.
This manual is related to the following products: