Powering up, Powering up -2 – Juniper Networks ERX-1410 User Manual
Page 90

CHAPTER 6
Powering Up the System
6-2
Powering Up
This procedure assumes that the system is already connected to a DC 
power source. See 
Chapter 4, Cabling the ERX System
.
For specifications on the electrical requirements for the system, see
Appendix A, System Specifications
. For details on the power consumed
by the different ERX modules, see
Appendix B, Module Specifications
.
Branch Circuit Caution: Evaluate the overall loading of the branch circuit before 
you install any equipment into a rack.
To power up the system:
1
Turn on the power switches located on the power input module in 
the rear of the system. See 
.
2
Monitor the LEDs on the front of the SRP modules to verify that the 
system is booting properly. See 
in
.
When the prompt appears on the system console, the system is in 
User Exec mode:
host1>
3
Enter the
enable command to access the Privileged Exec mode:
host1>enable
host1#
In Privileged Exec mode you can begin to configure the system. See 
the
ERX System Basics Configuration Guide, Chapter 2, Command
Line Interface
for more information.
Connect DC power (–48 VDC) to the power input lugs on the 
power input module. 
Chapter 4, Cabling the 
ERX System
Connect a management console to the system.
Chapter 5, Accessing 
the ERX System
(Optional) Connect the 10/100Base-T port to the network.
Chapter 5, Accessing 
the ERX System
Table 6-1 Installation tasks (continued)
Installation Task
Reference
