Preparing your site, Your preinstallation responsibilities, Appendix d – Juniper Networks ERX-1410 User Manual
Page 153: Appendix d, preparing your site
![background image](/manuals/134110/153/background.png)
D
Preparing Your Site
This chapter provides information about preparing your site before
installing the ERX system. We recommend that you consider all
requirements and specifications indicated in this appendix before
installing the system.
Your Preinstallation Responsibilities
Complete the following tasks before installing the system:
•
Verify that the electrical supply meets all AC and DC power
requirements. See
Appendix A, System Specifications
•
Verify that the site meets all environment specifications. See
•
Verify that the cables you plan to use meet the specifications, and
review the cabling recommendations. See
later in this appendix.
•
Verify the operation of all telephone circuits, digital services, and T1
facilities required for installation.
Topic
Page