Intel SR9000MK4U User Manual
Page 108

86
Intel
®
Server System SR9000MK4U Product Guide
2. Tighten the two captive screws at the bottom of the power supply support. See the
figure below.
Figure 87. Tightening the Power Supply Support Screws
3. Determine your next course of action and refer to the appropriate steps:
—
If you are following these steps as part of another procedure, return to that
procedure.
—
If you are ready to re-assemble your server system, install the following items,
in order:
✧ The power supply box. For instructions, see
.
✧ All installed power supplies. For instructions, see
✧ The power supply filler panel, if necessary. For instructions, see
. Follow step 4 only.
✧ The top cover. For instructions, see
“Installing the Top Cover” on page 37
AF001247