Gateway E-9525R User Manual
Page 63
Installing and removing an optional mezzanine board
www.gateway.com
57
4
Align the holes on one side of the board with the plastic standoffs (1) and
align the other side with the mezzanine board slot (2).
5
Push down on the board (3) to seat it in the mezzanine board slot and onto
the plastic standoffs until the retaining tabs snap into place.
6
Replace the PCI riser card assembly by following the instructions in
“Installing and removing PCI expansion cards” on page 44.
7
Follow the instructions in
“Closing the server case” on page 32
.
To remove an optional mezzanine board:
1
Follow the instructions in
“Preventing static electricity discharge” on
. Make sure that you turn off the server, then unplug the power
cord(s) and all other cables connected to the server.
2
Follow the instructions in
“Opening the server case” on page 31
.
3
Remove the PCI riser assembly by following the instructions in
and removing PCI expansion cards” on page 44
.
4
Push aside the plastic retaining tabs (1) and pull the mezzanine board (2)
out of the mezzanine board slot.
5
Replace the PCI riser card assembly by following the instructions in
“Installing and removing PCI expansion cards” on page 44.
6
Follow the instructions in
“Closing the server case” on page 32
.
2
3