Gateway E-9525R User Manual
Page 54
CHAPTER 4: Installing Components
www.gateway.com
48
8
Place the new system fan cage and fans onto the locking tabs (standoffs)
in the chassis (3), then push it in the direction of the arrow to lock it into
place (4).
9
Replace the fan duct into the chassis.
10
Follow the instructions in
“Closing the server case” on page 32
.