Gateway E-9525R User Manual
Page 20
CHAPTER 2: Setting Up Your Server
www.gateway.com
14
3
Align the slots in the back server rails with the studs on the side of the
server, then engage the slots with the studs and slide the rail forward until
it stops.
4
Align the locking screw holes in the rails with the threaded screw holes
in the server, then install one locking screw through the each back server
rail.
5
Attach one mounting nut to each of the two front cabinet posts where
you plan to install the server.
Stud
Stud
Locking screw (installed)
Back server rail
(installed)
Front cabinet post
Mounting nut