beautypg.com

Gateway E-9525R User Manual

Page 20

background image

CHAPTER 2: Setting Up Your Server

www.gateway.com

14

3

Align the slots in the back server rails with the studs on the side of the
server, then engage the slots with the studs and slide the rail forward until
it stops.

4

Align the locking screw holes in the rails with the threaded screw holes
in the server, then install one locking screw through the each back server
rail.

5

Attach one mounting nut to each of the two front cabinet posts where
you plan to install the server.

Stud

Stud

Locking screw (installed)

Back server rail
(installed)

Front cabinet post

Mounting nut