beautypg.com

4 verifying the hardware operation, 4 hot replacement/hot addition, Verifying the hardware operation – FUJITSU SPARC ENTERPRISE M3000 User Manual

Page 89: Hot replacement/hot addition, Section 4.4, “hot replacement/hot, Section 4.4

background image

Chapter 4

FRU Replacement Preparation

4-7

3. Type the cfgadm command to verify that the component has been configured.

The configured component is displayed as being configured.

The READY LED (green) of the HDD goes on.

4.3.4

Verifying the Hardware Operation

Confirm the status of the LED indicators.

For information on the LED status, see

TABLE 2-3

and

TABLE 2-5

.

4.4

Hot Replacement/Hot Addition

In hot replacement, the target FRU is operated while the domain to which the FRU
belongs is stopped.

Depending on the target FRU, there are two cases as follows:

Power supply unit/Fan unit: operated with XSCF commands.

Hard disk drive: operated directly, not by using XSCF commands.

For hot addition, do the same operation as that for hot replacement.

# cfgadm -a