Position for break out (cont.) – Hawk Industries Hawkjaw Jr. Manual 65K-2GJR Serial Numbers 10 to 20 User Manual
Page 28
![background image](/manuals/460485/28/background.png)
Position for Break Out (cont.)
Operation
28
TB
9. Check that the HawkJaw Top
wrench (TW), Middle wrench
(MW) and Bottom wrench (BW)
hang straight and level when the
drill pipe is against the pipe stop.
10. If the HawkJaw wrenches (TW,
MW, BW) hang tilted forward or
backward, use the crescent wrench
to adjust the
Turnbuckle
(TB).
11. If the HawkJaw wrenches (TW,
MW, BW) hang sloped to the
right or to the left, use the Control
Handles (CH) to back the
HawkJaw off the pipe. Use Lower
(L) to lower the HawkJaw to the
rig floor. Repeat Step 2.
12. Make sure the Pipe stop (PS) is
against the drill pipe
connection.
TW
NOTE
The HawkJaw performs best when it
hangs aligned with pipe.
Part Name
Part #
Turnbuckle (TB)
061-3022T56
Part Numbers
PS
BW
MW