1 overview, 2 configure eserver project settings, 2.1 overview – Innotech eServer User Manual
Page 74: 2.2 launch project for configuration, Open the magellan project, 1 overview 4-2 configure eserver project settings

eServer Setup and Site Installation Instructions
Page 74
© Mass Electronics Pty Ltd 2009
Edition 5.0 dated 07/01/2014
Figure 4-1: Open the Magellan project
4-1 Overview
This section provides an overview of the steps required to configure security and access control on
eServer software to allow remote computers to access Magellan projects via the eServer software.
Additionally, steps are provided to enable eServer to communicate with an SQL Server database.
4-2 Configure eServer Project Settings
4-2.1 Overview
This section provides instructions on how to configure your eServer Project Settings to work as part
of a system including Innotech eServer 1.20 or greater. Specifically, this section provides information
on how to open your project and set project connection properties for a database, iComm server
and connected devices.
4-2.2 Launch Project for Configuration
Shutdown eServer and open
Magellan Builder v1.20 or greater. From the menu bar, open the
Magellan Package, as illustrate below in Figure 4-1.
Ensure you are logged into the computer as a System Administrator. You will need to use Magellan Builder v1.20
or greater to configure the project settings, so ensure you have a Magellan Builder security dongle in addition to the
eServer security dongle. Once you have setup the eServer Host computer, you may remove the Magellan Builder
security dongle, leaving just the eServer security dongle installed.
NOTE