ProSoft Technology 5201-DFNT-104S User Manual
Page 48

104S v2 ♦ ProLinx Gateway
IEC-60870-5-104 (104S) Protocol Implementation
(Firmware v2.xx)
Protocol Manual
Page 48 of 157
ProSoft Technology, Inc.
4 Make sure that the other parts of your application correctly update gateway
memory database regions through the other gateway communication
protocol, as shown in the following illustration.
All points must be configured in the correct location in the 104S v2 database in
order to be properly updated by the other gateway protocol by configuring the
control points and monitor points in separate areas of the 104S v2 database. The
following illustration shows an example configuration:
In this example, all monitor points are located between database addresses 0
and 199, and all control points are located between address 200 and 399.