beautypg.com

Chapter 2 installing and starting nas system – PLANET NAS-7450 User Manual

Page 12

background image

11

Chapter 2 Installing and Starting NAS system

This chapter covers the installation procedure of different form factors of NAS server as well as the

NAS-7450/NAS-7850 Mobile Rack. Instruction on how to startup the NAS server by setting up the basic

configuration through the Admin Home page or provided software tool – NAS Finder is also outlined in

this chapter.

2.1 Installing the NAS-7450/NAS-7850 rack-mount Model


NAS-7450

NAS-7850

Hot swap hard disk tray installation

1. To unlock the hot swap hard disk tray, pull the tab behind the end of the lever to release the latch and

then lift the lever up as far as it can go to disengage the hard disk tray from the chassis.

2. Pull the hard disk drive tray out.

3. Attached the HDD to the hot swap hard disk tray with the screws provided shown in Figure 2.

This manual is related to the following products: