beautypg.com

Avago Technologies Syncro CS 9271-8i User Manual

Page 61

background image

LSI Corporation

- 61 -

Syncro CS 9271-8i Solution User Guide
October 2013

Chapter 4: System Administration

Understanding Failover Operations

3.

In the left panel, expand the tree to display the disks, as shown in the following figure.

Figure 41 Expand Tree

4.

Right-click on the entry in the Assigned To column in the center panel of the window.

5.

On the pop-up menu, select Move > Select Node, as shown in the following figure.

Figure 42 Expand Tree

6.

Select the node for the planned failover.