Precision Digital PD6100 User Manual
Page 43

Model PD6100 Strain Gauge/Load Cell Meter Instruction Manual
43
Calibrating the Meter with Strain Gauge/Load Cell (Cal)
To scale the meter without a signal source
refer to Scaling the Meter (SCALE), page 44.
The meter can be calibrated to display the process variable in
engineering units by applying the appropriate input signal and following
the calibration procedure.
The use of a calibrated signal source is strongly recommended to
calibrate the meter.
Warm up the meter for at least 15 minutes
before performing calibration to ensure
specified accuracy.
Multi-Point Calibration & Scaling
The meter is set up at the factory for 2-point linear calibration. The
number of points for multi-point calibration/scaling is set up in the
Advanced
Features menu. Up to 32 linearization points may be selected
for PV1 and up to 8 linearization points may be selected for PV2. See
page 78 for details.
The display flashes
while sensing
the inputs