beautypg.com

Magnum Energy MS-PE Series User Manual

Page 5

background image

©

2013 Magnum Energy, Inc.

Page iv

Table of Contents

1.0 Introduction

..................................................................................1

1.1 Regulatory

Compliance

...................................................................................... 1

1.2 How an Inverter/Charger Works .......................................................................... 2

1.2.1 Inverter Applications for Permanent Installations .............................................. 2
1.2.2 Inverter Applications for Mobile Installations .................................................... 2

1.3 Advantages of using a Pure Sine Wave Inverter ..................................................... 2
1.4 Features and Benefi ts ........................................................................................ 3

2.0 Installation

...................................................................................6

2.1 Pre-Installation

................................................................................................. 6

2.1.1 Unpacking and Inspection ............................................................................. 6
2.1.2 Required Tools and Materials .......................................................................... 6
2.1.3 Locating the Inverter .................................................................................... 8

2.2 Mounting the Inverter ........................................................................................ 9
2.3 Wiring the Inverter – General Requirements ........................................................11

2.3.1 Protecting Wire – Conduit Box or Inverter Enclosure ........................................11
2.3.2 Wiring

Requirements

...................................................................................11

2.3.3 Wire

Routing

..............................................................................................11

2.3.4 Torque

Requirements

...................................................................................11

2.4 DC

Wiring

.......................................................................................................12

2.4.1 DC Wire Sizing ............................................................................................14
2.4.2 DC Overcurrent Protection ............................................................................14
2.4.3 DC Cable Connections ..................................................................................15
2.4.4 Wiring the Battery Bank ...............................................................................16
2.4.5 Battery Temperature Sensor Installation and Wiring .........................................16
2.4.6 Wiring the Inverter to the Battery Bank ..........................................................17

2.5 AC

Wiring

........................................................................................................18

2.5.1 Pre-AC Wiring Requirements .........................................................................18
2.5.2 AC Wire Size and Overcurrent Protection ........................................................18
2.5.3 AC Terminal Block Connections ......................................................................19
2.5.4 AC Conductor Wiring ...................................................................................20
2.5.5 AC Wiring Confi guration ...............................................................................20

2.6 Grounding

Inverters

.........................................................................................22

2.6.1 Sizing the Grounding Electrode Conductors .....................................................23
2.6.2 System Bonding Jumper ...............................................................................25
2.6.3 Equipment Grounding Conductor ...................................................................25
2.6.4 Grounding on Boats .....................................................................................26
2.6.5 Neutral to Safety Ground Bonding .................................................................27
2.6.6 Disabling the Neutral-to-Ground Connection ...................................................28
2.6.7 Connecting a Large Ground Wire ...................................................................28

2.7 Inverter

Notifi cation Requirements .....................................................................29

2.7.1 Inverter Warning Label ................................................................................29

2.8 Final

Inspection

...............................................................................................29

2.9 Functional

Test

................................................................................................30

This manual is related to the following products: