SMA STP 10000TL-10 Installation User Manual
Page 57

SMA Solar Technology AG
7 Commissioning
Installation Manual
STP10-17TL-IA-en-32
57
9. Plug the Electronic Solar Switch in firmly right up to
the stop.
10. Switch on the miniature circuit-breaker.
11. If a multi-function relay is connected, switch on the supply voltage.
12. Check whether the display and LEDs are indicating a normal operating state.
☑ If the inverter has been commissioned successfully, the green LED should be on or flashing,
provided there is sufficient solar irradiation.
The significance of a glowing red LED and of the event numbers on the display is described in
Section 11.2.
LED
Colour
Meaning
A
Green
Glowing: operation
Flashing: waiting for
sufficient irradiation
B
Red
Disturbance
C
Blue
Bluetooth communication
is active
This manual is related to the following products: