6 Electrical Connection
SMA Solar Technology AG
46
STP10-17TL-IA-en-32
Installation Manual
6.5.1 Checking the Country Standard
Check whether the inverter is set to the country of installation.
Before commissioning:
• Check that the country standard of the inverter is correct by comparing the default settings of
the inverter listed on the supplementary sheet provided.
After commissioning:
• Check that the country standard is correct by checking the display message during
(re-)commissioning (see Section 7 "Commissioning", page 56).
or
• Check that the country standard is correct using the "SMA grid guard" measuring channel via
a communication product.
The settings of each country data set are specified in the operating parameters. The parameters can
be read out using a communication product. The description of the operating parameters is available
at www.SMA-Solar.com in the category "Technical Description" of the respective inverter.
Display language
Once you have set the country standard, you can always set the display language later using
rotary switch B. However, you have to then set rotary switch A to "0" in order to keep the
country data set.
(A) (B) Country data set
Display language
Grid Guard
protection
Country
0
0
default settings
default settings
dependent on
parameter set
dependent on
parameter set
0
1
retained
English
dependent on
parameter set
dependent on
parameter set
0
2
retained
German
dependent on
parameter set
dependent on
parameter set
0
3
retained
French
dependent on
parameter set
dependent on
parameter set
0
4
retained
Spanish
dependent on
parameter set
dependent on
parameter set
0
5
retained
Italian
dependent on
parameter set
dependent on
parameter set
0
6
retained
not assigned*
dependent on
parameter set
dependent on
parameter set