SMA STP 10000TL-10 Installation User Manual
Page 24

5 Mounting
SMA Solar Technology AG
24
STP10-17TL-IA-en-32
Installation Manual
3. Hook the inverter into the rear panel, ensuring that
the inverter enclosure is positioned flush against the
rear panel.
– For two people to transport the inverter, hold the
inverter by the recessed grips at the bottom and
the top edge of the enclosure lid.
– For transport by crane, you can attach two ring
bolts to the top of the inverter (see A: M10,
diameter = 10 mm). To do this, remove the
filler-plugs and screw in the ring bolts as far as
they will go.
4. Remove the ring bolts after transport and re-attach the filler-plugs.
5. Release all six captive screws of the lower
enclosure lid.
6. To remove the lower enclosure lid, lift it from the
bottom.
7. Screw the supplied eye bolt into the hole provided
in order to secure the enclosure from being
dislodged. The eye bolt only needs to be fastened
hand-tight.
A