Chapter 5 preparations for operation, Confirmation inside granulator – AEC Colortronic MS Series Screenless Granulator User Manual
Page 24
Chapter 5 Preparations for operation
- 19 -
[WO-3531;ET 19]
This chapter describes preparatpry operations necessary for starting
the equipment.
WARNING
When confirmation work is started, primary power supply is surely put
off first, and you must avoid danger by incorrect operation.
1. Confirmation inside granulator
Step
Item
Description
1 Lock confirmation of
caster
Confirm whether caster with lock×2 of the installation base is locked
securely.
CAUTION
Be sure to do two locks of caster except that you move granulator.
2 Open feed hopper
Remove feed hopper clamp, and open feed hopper.
WARNING
It is pushed down slowly with keep feed hopper from the down side
when feed hopper is opened.
Don't insert a hand and a finger into stopper.
When a hand and a finger are inserted into pinch point, it has the
danger of lacerations and fracture.
3 Confirmation inside
granulator
◇
Confirm whether there is a mixing of the different material inside the
equipment.
◇
Confirm whether there is looseness in each fixed bolts of fixed cutter and
guide plate.
4 Close feed hopper
Strangle a clamp securely, and fix it after you close feed hopper.
WARNING
When feed hopper is closed, it is lifted slowly.
At that time, be careful to insert a hand and a finger into pinch point.
When a hand and a finger are inserted into pinch point, it has the
danger of lacerations and fracture.