beautypg.com

Chapter 5 preparations for operation, Confirmation inside granulator – AEC Colortronic MS Series Screenless Granulator User Manual

Page 24

background image

Chapter 5 Preparations for operation

- 19 -

[WO-3531;ET 19]

This chapter describes preparatpry operations necessary for starting
the equipment.

WARNING

When confirmation work is started, primary power supply is surely put
off first, and you must avoid danger by incorrect operation.

1. Confirmation inside granulator

Step

Item

Description

1 Lock confirmation of

caster

Confirm whether caster with lock×2 of the installation base is locked
securely.

CAUTION

Be sure to do two locks of caster except that you move granulator.

2 Open feed hopper

Remove feed hopper clamp, and open feed hopper.

WARNING

It is pushed down slowly with keep feed hopper from the down side
when feed hopper is opened.
Don't insert a hand and a finger into stopper.
When a hand and a finger are inserted into pinch point, it has the
danger of lacerations and fracture.

3 Confirmation inside

granulator

Confirm whether there is a mixing of the different material inside the

equipment.

Confirm whether there is looseness in each fixed bolts of fixed cutter and

guide plate.

4 Close feed hopper

Strangle a clamp securely, and fix it after you close feed hopper.

WARNING

When feed hopper is closed, it is lifted slowly.
At that time, be careful to insert a hand and a finger into pinch point.
When a hand and a finger are inserted into pinch point, it has the
danger of lacerations and fracture.