Chapter 4 installation – AEC Colortronic MS Series Screenless Granulator User Manual
Page 21
Chapter 4 Installation
- 16 -
[WO-3531;ET 16]
This chapter describes the method of installing the product step by
step.
Step
Item
Description
1 Installation of the
equipment
Install the equipment on a stable level floor.
Secure an installation place for maintenance to be made in consideration of the
space where feed hopper can be opened.
DANGER
Don't tip over granulator for heavy weight.
Damage such as a fracture is suffered when it is caught under the
equipment.
When moving equipment, watch for crevices, stairs, or grades on the
floor to prevent tipping, then, be fully careful.
And, do the disposal of set up an iron plate when there are ditch and
hole in the movement passage.
2 Casters locked
Be sure to do two locks of caster as shown in Fig.4-1.
Figure 4-1
CAUTION
Be sure to do two locks of caster except that you move equipment.
3 Preparation for the
primary power supply
Confirm a use standard voltage to indicate in nameplate of the equipment.
Then, prepare an outlet for the standard voltage or power supply box.