beautypg.com

Span endpoint performance screen, Span endpoint performance screen -17, Figure 3.14 – Verilink WANsuite 5650 (34-00314.E) Product Manual User Manual

Page 39

background image

V T 1 0 0 I n t e r f a c e

3-17

P ow er S ou rce

This field indicates the DC power source being used by the associated unit.

R estart E n d p oin t

This field enables the manager to trigger a soft restart of the SHDSL line at
the associated segment endpoint. The manager may only set this object to the
“restart” value to initiate a restart. The agent will perform a restart after
approximately 5 seconds, and restore the object to the “ready” state.

Values:Ready, Restart
Default:Ready

Span Endpoint Performance Screen

The Span Endpoint Performance screen (Figure 3.14) is accessed by moving
the cursor to the “Performance” field in the Span Endpoint Details screen and
pressing the “Enter” key. This screen displays information on the
performance and error status of the span endpoints. This information is
provided in a summary form for complete totals as well as that for current 15-
minute and 1-day intervals.

Figure 3.14

Span Endpoint Performance Screen

T im e E la p sed

Total elapsed time (in seconds) in the current 15-minute and 1-day intervals.

E S

Count of Errored Seconds (ES) on this endpoint since the unit was last
restarted.

C R C

Count of CRC anomalies on this endpoint since the unit was last restarted.

L O S W S

Count of Loss of Sync Word (LOSW) Seconds on this endpoint since the unit
was last restarted.

S E S

Count of Severely Errored Seconds (SES) on this endpoint since the unit was
last restarted.

U A S

Count of Unavailable Seconds (UAS) on this endpoint since the unit was last
restarted.