beautypg.com

Manual schedules – Seaward PATGuard Elite SQL User Manual

Page 60

background image

Seaward PATGuard Elite SQL 2 User Manual

- 58 -

Rev. 1.4

Manual Schedules

To display a Test Schedule not generated by the Auto Scheduler, select Asset view filter… from the View drop
down. Check the Filter asset view by next test date to enable the date fields and other options.

Figure 49: Asset View Filter


If you wish to view only overdue Assets that require re-test, select Show all assets that have overdue tests. Then
OK to action this selection.

To view Assets over a date period, enter the dates for the period that you wish to view a Test Schedule. To change
the date, select the appropriate date drop down. A calendar is displayed. To change the year, select the year with the
mouse, then use the up and down arrows to advance or retard the year. To change the month, select the left or right
arrows with the mouse until the appropriate month is selected. To change a date within the month, simply select the
appropriate date with the mouse.

To include Visual tests within the schedule then check the Include Visual Test in Schedule box otherwise the
filter will select only Full Tests that meet the selection criteria.

Note

Assets with no next test dates will be excluded.


The current Schedule period is displayed in the lower Main window. To return to the full display, open the Asset
View Filter dialog box as above and uncheck the Filter asset view by next test date box.

This manual is related to the following products: