3-16 PBC Unit is now ready for to Check Battery Back-up Operation.

Battery Tray shall be powered up for 24 to 48 hours before the battery back-up Operational Test.

After battery discharge, the batteries shall be recharged for 24 hours.

Turn “CB1" to the “ON” position and turn AC input breaker to “OFF ".

The Green “AC ON" LED shall go to “OFF” and the Green “INV ON" LED will stay “ON".

The “BATTERY LEVEL" shall LED’s will be “ ON “.

Turn AC input voltage “ON ". The Green “AC ON" LED shall go to “ON".

The Green “INV ON” LED will stay “ON". The Green “BATTERY LEVEL" shall stay “ ON “.

Turn CB 3 to “ON".

With a Digital Voltmeter check the output voltage.

Apply the load in steps. The Green “LOAD LEVEL" LED’s will light in succession as additional load
increases.

See Appendix C for battery evaluation.


3-17 The Backup Power Cabinet is ready for usage

.

3-18 PBC Pad Layout.

• Use M12 or 1/2 inch Anchor Bolts for mounting

PAD Plate to Concrete Pad or Roof.

• PAD Plate may be crossways to door as shown.


3-19 PBC Pad Installation.

• Verify Center spacing of mounting bracket bolts are correct.

CONDUIT CONNECTION

AREA

17.00

19.50

4.00

12.00

PAD

MOUNTING

PLATE

4” W x 14” L x3” H

HOLE IS

5/ 8 x 1 1/4

O.D.

DOOR OPENING

120 DEGREE

ANGLE MAX

• Carefully lift the Cabinet into place on pad over the mounting bolts
• Verify Pad mounting brackets bolts have been torque to 165-inch lbs.
• Install the Conduits to the bottom of the Cabinet; follow directions in 3–9 and Illustration 3–3.
• Install the Cabinet to the Pad, and then use section 3–10 through 3–12 for electrical wiring.
• Check out the Electronic Tray wiring using Section 3-13 & Battery Tray connections per 3-14.

• PBC is ready for Normal operational Check out using Section 3-15 thru 3-17.