beautypg.com

Preheating – Ivoclar Vivadent IPS InLine System User Manual

Page 62

background image

62

Preheating

After the stipulated setting time of the respective investment material (IPS PressVEST or IPS PressVEST Speed), the invest-
ment ring is prepared for preheating as follows:
– Remove the ring gauge and ring base with a turning movement.
– Carefully push the investment ring out of the IPS Silicone Ring.
– Remove rough spots on the bottom surface of the investment ring with a plaster knife. Check the 90° angle. Investment

material residue must not enter the sprues. Blow into the sprues if necessary.

– If several investment rings are preheated together, mark them with the respective ingot shade.
– When placing several investment rings in the preheating furnace using the Speed method, make sure that the furnace

temperature does not drop too much.

Setting time

Preheating furnace temperature

Position of the investment ring in
the furnace

IPS InLine PoM ingots

IPS Alox plunger/IPS One-Way
plunger 300g

Holding time at final temperature

850°c/1562°f

Important

IPS PressveSt

min. 60 min

Start room temperature heat up

to 850 °C/1562 °F / 5 °C/9°F min

towards the rear wall, tipped with the

opening facing down

at least 90 min

IPS PressveSt Speed

min. 30 min, max. 45 min

Direct 850 °C/1562 °F

towards the rear wall, tipped with the

opening facing down

at least 90 min

If several Speed investments are to be

conducted, they should be invested

consecutively and placed into the pre-

heating furnace at an interval of

approximately 20 minutes. Make sure

that the furnace temperature does not

drop too much when placing the

investment rings into the preheating

furnace. The stipulated holding

time counts from the point when the

preheating temperature has been

reached again.

In order to ensure smooth working procedures in the laboratory on a daily basis, impeccable functioning of the infra-
structure, particularly the preheating furnaces, is essential. This includes their maintenance, cleaning with a vacuum
cleaner in a cool state as well as regular checks of the temperature controls and heating elements, etc. by the manufacturer.

Position the heating muffle towards the rear wall, tipped with the opening
facing down

Do not preheat the IPS InLine PoM ingot and the IPS One-Way plunger.

no preheating

no preheating