23

Grounding

o At least 10 mm

2

Grounding cable to pump chassis

o At least 10 mm

2

Grounding cable to CFN PLUS pole

o Grounding cable to TLG – in accordance with TLG manufacturer

instructions.

Tank conduit

o TLG probe

2-4.5. Wiring conduits in CFN PLUS
CFN PLUS includes four wiring openings, each carrying specific wires, as listed in Table 2-1 and
shown in Figure 2-3.

Table 2-1. Conduits into CFN PLUS

No.

Conduit Type

Type

1

Low voltage

Pulser, TLG, LAN

2

High voltage

AC power, GND, control

3 High

voltage

In-use

2

2

-

-

5

5

.

.

C

C

O

O

N

N

D

D

U

U

I

I

T

T

S

S

I

I

N

N

S

S

T

T

A

A

L

L

L

L

A

A

T

T

I

I

O

O

N

N

2-5.1. General
This paragraph describes the infrastructure groundwork necessary to install the conduits in the
station (see Figure 2-1).

2-5.2. Installing Conduits in Station
Proceed as follows:

1. Determine the location of the CFN PLUS in the station.
2. Dig and prepare passageways for the necessary conduits
3. Route the following conduits to the inspection boxes:
• Low voltage cables inspection box:

o One conduit to Office (control room)
o One conduit to each pump
o Two conduits to CFN PLUS