Installing the FiPay Server and Additional Hardware Components in the 8-hose Islander PLUS System

Page 22

MDE-5045 FiPay™ Server Retrofit Kit for 8-hose Islander Installation Guide · January 2013

34

FiPay LAN ports and 5-port Switch locations in the Islander PLUS are shown in

Figure 28

.

• Run cable from LAN 2 of the FiPay Server to the LAN 2 5-port Switch
• Run cable from LAN 2 of the Orpak Controller Unit (OrCU) to the LAN 2 5-port Switch
• Run cable from LAN 1 of the FiPay Server to the LAN 1 5-port Switch
• Run cable from the Wide Area Network [WAN (in conduit)] to the LAN 2 5-port Switch

Figure 28: FiPay LAN Ports and 5-port Switch Location

LAN 2 5-port Switch

- FiPay Server LAN 2
- OrCU LAN 2
- WAN

LAN 1 5-port Switch

- FiPay Server LAN 1

To avoid confusion, FiPay Server is clearly marked as LAN 1 and LAN 2 as shown in

Figure 29

.

Figure 29: LAN 1 and LAN 2 of Fipay Server