Page 13

Completing Installation

6

Connect the union to the bushing on the J-box.

7

At the top of the conduit, bend and shape the conduit to accommodate connecting to the black
and white wires extending from the AC IN side of the LED driver assembly.

8

Using the tie-wraps, secure the conduit to the unit to prevent movement. For typical tie-wrap
placement, see

Figure 9

on

page 12

.

9

Once the wiring in the J-box is complete, remount the J-box cover and secure with the bolts
saved.

Installing the retrofit conduit (mechanical models) is now complete.

Completing Installation

To complete the installation, proceed as follows:

1

Complete the wiring to the LIGHT FEED and LIGHT NEUTRAL in the AC J-box. For more
information, refer to MDE-4331 Atlas

Fuel Systems Installation Manual and Atlas wiring

diagrams.

2

On the electronic model units, secure the display panel in the upright position.

3

Attach the bezel. Ensure the bezel is seated properly to ensure a watertight seal.

4

Attach and lock the front panel.

5

Turn on all the circuit breakers supplying power to the unit.

Avoid looking directly at the LEDs when lit. Ensure bezels are in place with brand
panel graphics installed before lighting LED strips.

WARNING

Installing the Lamp Kit in Atlas pumps/dispensers 8700K/9100K (mechanical) and

8800K/9800K (electronic) is now complete.