Gasboy 8700K User Manual
Gasboy Hardware
MDE-4512A Lamp Kit (M06227K00X) Installation Instructions for Atlas® 8700K/9100K and 8800K/9800K · June 2014
Page 1
Introduction
Purpose
This manual provides instructions to install the Lamp Kit (M06227K00X) on the following
Atlas
®
pumps/dispensers:
• Models 8700K/9100K (Mechanical) - M06227K001 Kit
• Models 8800K/9800K (Electronic) - M06227K002 Kit
Required Reading
Before installing the kit, review and follow:
• National Fire Protection Association (NFPA) 30A and the Automotive and Marine Service
Station Code.
• NFPA 70
®
and The National Electrical Code (NEC
®
).
• Applicable federal, state, and local codes and regulations.
Failure to do so may adversely affect the safe use and operation of the equipment.
Note: These kits must be installed by a Gasboy
®
Authorized Service Contractor (ASC) to
ensure warranty.
Table of Contents
Topic
Page
Installing Lamp Kit (M06227K00X)
Required Tools and Materials
Following tools and materials are required to install the Lamp Kit:
• Open-end Wrench Set
• Phillips
®
and Flat-blade Screwdrivers
• Pair of Pliers
• Wire Cutter/Stripper
MDE-4512A
Lamp Kit (M06227K00X) Installation Instructions for
Atlas
®
8700K/9100K and 8800K/9800K
June 2014