MDE-4096C Blackmer® Global Dispenser Pump Operation, Maintenance and Kit Installation Manual · April 2008
Maintenance
Strainer/Check Valve Installation
To install the strainer/check valve, proceed as follows:
1
If equipped with the check valve option, insert the dome strainer (25) into the bore (see
Figure 2: Strainer/Check Valve
Strainer Support
Strainer (17)
O-Ring (18)
Strainer Cover (19)
Screws (21)
Optional
Check
Valve (16)
Optional Dome
Strainer (25)
2
Clean the debris from the check valve, especially at the O-Ring seats.
3
Lubricate O-Ring before installing check valve assembly.
4
Insert the check valve assembly (16) or check cap (30) into corresponding pump bore as
shown (see
)
.
Press the assembly squarely over receiving cylindrical surface until O-
Ring seats firmly over the surface and holds assembly in position.
5
Insert new or cleaned strainer (17) into bore, over check valve assembly.
6
Clean debris from strainer cover O-Ring groove and install O-Ring (18). If O-Ring does not
stay in place, use a small amount of all purpose grease to hold the O-Ring in groove.
7
Install strainer cover (19) with screws (21). Hand tighten, alternating between each screw to
keep the cover parallel to the casing face. Torque the screws to 150 in. lbs (17 Nm). Do not
overtighten. Overtightening may cause damage to screw or casing.